Hikma Pharmaceuticals PLC (OTCPK:HKMPF) Q2 2024 Pre-Recorded Presentation August 8, 2024 2:30 AM ET Company Participants Riad Mishlawi - CEO & Director Khalid Nabilsi - CFO Riad Mishlawi Thank you for joining our 2024 half year results presentation. I'm Riad Mishlawi, CEO of Hikma, and I'm joined here with Khalid Nabilsi, our CFO.
LONDON, UNITED KINGDOM / ACCESSWIRE / August 9, 2024 / The Company announces that on 08 August 2024 it purchased the following number of its ordinary shares of 20340/399pence each through Goldman Sachs International ("GSI") on the London Stock Exchange in accordance with the authority granted by shareholders at the Company's Annual General Meeting on 3 May 2024 (the "Purchase"). The Purchase was effected pursuant to instructions issued by the Company on 20 February 2024, as announced on 20 February 2024.
Diversified Energy Company PLC (DEC) concluded the recent trading session at $13.84, signifying a +0.8% move from its prior day's close.
LONDON, UNITED KINGDOM / ACCESSWIRE / August 8, 2024 / The Company announces that on 07 August 2024 it purchased the following number of its ordinary shares of 20340/399pence each through Goldman Sachs International ("GSI") on the London Stock Exchange in accordance with the authority granted by shareholders at the Company's Annual General Meeting on 3 May 2024 (the "Purchase"). The Purchase was effected pursuant to instructions issued by the Company on 20 February 2024, as announced on 20 February 2024.
The average of price targets set by Wall Street analysts indicates a potential upside of 34.3% in Marex Group PLC (MRX). While the effectiveness of this highly sought-after metric is questionable, the positive trend in earnings estimate revisions might translate into an upside in the stock.
LONDON, UNITED KINGDOM / ACCESSWIRE / August 7, 2024 / TR-1: Standard form for notification of major holdings 1. Issuer Details ISIN GB00BF7J2535 Issuer Name TRIDENT ROYALTIES PLC UK or Non-UK Issuer UK 2.
Purchase of own shares LONDON, UK / ACCESSWIRE / August 7, 2024 / The Company announces that on 06 August 2024 it purchased the following number of its ordinary shares of 20340/399pence each through Goldman Sachs International ("GSI") on the London Stock Exchange in accordance with the authority granted by shareholders at the Company's Annual General Meeting on 3 May 2024 (the "Purchase"). The Purchase was effected pursuant to instructions issued by the Company on 20 February 2024, as announced on 20 February 2024.
LONDON, UK / ACCESSWIRE / August 6, 2024 / InterContinental Hotels Group PLC (the Company) The Company announces that on 05 August 2024 it purchased the following number of its ordinary shares of 20340/399pence each through Goldman Sachs International ("GSI") on the London Stock Exchange in accordance with the authority granted by shareholders at the Company's Annual General Meeting on 3 May 2024 (the "Purchase"). The Purchase was effected pursuant to instructions issued by the Company on 20 February 2024, as announced on 20 February 2024.
Purchase of own shares LONDON, UNITED KINGDOM / ACCESSWIRE / August 5, 2024 / InterContinental Hotels Group PLC (the Company)(NYSE:IHG)(LSE:IHG)(OTC PINK:ICHGF) The Company announces that on 02 August 2024 it purchased the following number of its ordinary shares of 20340/399pence each through Goldman Sachs International ("GSI") on the London Stock Exchange in accordance with the authority granted by shareholders at the Company's Annual General Meeting on 3 May 2024 (the "Purchase"). The Purchase was effected pursuant to instructions issued by the Company on 20 February 2024, as announced on 20 February 2024.
LONDON, ENGLAND / ACCESSWIRE / August 5, 2024 / Argo Blockchain plc, a global leader in cryptocurrency mining (LSE:ARB)(NASDAQ:ARBK), is pleased to provide the following operational update for July 2024. During the month of July, the Company mined 48 Bitcoin or Bitcoin Equivalents (together, "BTC"), or 1.5 BTC per day consistent with June 2024, which also averaged 1.5 BTC per day.
Purchase of own shares LONDON, UK / ACCESSWIRE / August 2, 2024 / The Company announces that on 01 August 2024 it purchased the following number of its ordinary shares of 20340/399pence each through Goldman Sachs International ("GSI") on the London Stock Exchange in accordance with the authority granted by shareholders at the Company's Annual General Meeting on 3 May 2024 (the "Purchase"). The Purchase was effected pursuant to instructions issued by the Company on 20 February 2024, as announced on 20 February 2024.
Santo Domingo Update LONDON, UNITED KINGDOM / ACCESSWIRE / August 1, 2024 / Ecora Resources PLC (LSE:ECOR)(TSX:ECOR) notes the press release issued by Capstone Copper Corp ("Capstone") on 31 July 2024 regarding the publication of an updated Feasibility Study ("FS") on the Santo Domingo project, over which Ecora holds a 2% Net Smelter Return royalty. The Group's royalty area includes the highest copper grade portion of the deposit, expected to be mined during the initial 6 to 7 years of production.1 Key highlights from the Feasibility Study include: The 2024 FS outlines a robust copper-iron-gold project with an after-tax net present value at an 8% discount rate of $1.7 billion and an after-tax internal rate of return of 24.1% Over the first seven years of the mine plan, production is expected to average 106,000 tonnes of copper and 3.7 million tonnes of iron concentrate at first quartile cash costs of $0.28 per payable pound of copper produced Over the Project's 19-year mine life, production is expected to average 68,000 tonnes of copper and 3.6 million tonnes of iron concentrate at first quartile cash costs of $0.33 per payable pound of copper produced Total initial capital cost of $2.3 billion drives a capital intensity of approximately $21,900 per tonne of annual copper equivalent production over the life of mine A 19-year mine life is supported by a higher Mineral Reserve2 estimate of 436 million tonnes at a copper grade of 0.33%, iron ore grade of 26.5%, and a gold grade of 0.05 grams per tonne Mineral Reserve tonnes have increased by 11% while contained copper has increased by 23% since the 2020 Feasibility Study The updated Santo Domingo 2024 FS was prepared by Ausenco, a multinational engineering, procurement, construction management, and operations service provider with broad international experience in the design and construction of concentrator projects of this scale.